What it takes, and what it costs you in time.

MIGRATION

What It Takes, and What It Costs You in Time.

Nobody in this category publishes a migration timeline, which is convenient for them and useless to you. Here is ours, including the parts that go wrong and the questions we ask before quoting a date.

Integrations are the timeline driver. Everything else is more predictable than you have been led to expect.

How a Migration Actually Runs

Typical phases for a catalog and search project. Durations are planning estimates that firm up after discovery, and the real variable is how many systems we connect to and how complex they are.

Weeks 1–2

Discovery and Catalog Audit

Which system owns which field, what your ERP has been customised to do, what your current URLs are worth, and the real state of the product data. The audit is part of onboarding, not a pre-sales ask.

Weeks 2–4

Product Data Setup and Unit Standards

The spec fields for each product family, the rules for converting units to one standard, and which system wins when two disagree. This is the work that decides whether search behaves.

Weeks 3–8

Integrations

Always the longest task. Scoped first so the schedule means something. Ready-made connections shorten it; a decade of undocumented ERP customisation lengthens it.

Weeks 4–8

Design System and Templates

Runs in parallel. Your brand applied to the library of ready-made page sections, the templates built once and reused, and marketing trained to operate them before go-live rather than after.

Weeks 6–10

Content, URLs and Redirects

Existing product URLs preserved or redirected. Losing indexed product pages is one of the few genuinely expensive mistakes available here, and it is entirely avoidable.

Weeks 8–12

Running Old and New Side by Side, Then Switching Over

The new catalog running against live data before anything switches, so the failure modes appear while the old site is still there to fall back to.

After go-live

Marketing Takes the Keys

Content and campaign pages move to your team on day one. If your marketers are still filing tickets a month later, the project did not land.

Planning estimates, not commitments. Discovery is what turns them into a date we will stand behind.

THE HONEST BIT

What Goes Wrong, and What We Do About It

Product Data Is Worse Than Expected

Almost always. It is why the catalog audit happens in week one rather than at the point it becomes a surprise.

An Undocumented ERP Customisation

Some business rule encoded in 2014 by someone who left in 2017. We go looking for these deliberately in discovery.

URL Structure Was Never Planned

Product URLs that encode a category that no longer exists. The redirect map is built before anything retires.

Nobody Owns the Content

The most common non-technical failure. Someone has to be accountable for the catalog copy, and it is better decided in week two than week ten.

The Questions Everyone Asks

Migrating from Where You Are

Kentico to EETech Commerce, Start to Finish.

We know this platform well, including from the inside: a substantial amount of our work has been building search, distributor integration and BOM tooling on top of client sites running on it.

What Changes

The content management story stays strong. What changes is where product data lives and what filtering it can support:

  • On Kentico: Products stored as custom page types held together by habit, without proper spec fields; spec filtering built as custom .NET code that you maintain; a catalog your team has to build and look after itself.
  • On EETech Commerce: Spec fields with units, ranges and data quality rules in a built-in PIM; search by spec value that converts units when products are loaded; the catalog maintained by us as part of the product.

The Honest Recommendation: Sometimes the Answer Is the Layer, Not the Migration

If you have invested heavily in Kentico recently, your marketing team depends on its personalisation, and the gap is specifically that buyers cannot find parts, then the right project is adding our search, distributor integration and BOM tools to your existing site rather than a replatform.

The case for a full migration is different: an ageing instance nobody wants to upgrade, a catalog layer that has become a standing engineering cost, and a marketing team that files tickets for content changes. If two of those three are true, the arithmetic usually favours moving.

Typical Migration Timeline (12 Weeks)

  • Weeks 1–2: Discovery and catalog audit. Content types, custom modules, and the real state of product data.
  • Weeks 2–4: Product data setup and unit standards. Custom page types mapped to spec fields for each product family, with unit rules defined.
  • Weeks 3–8: Integrations. Documented ERP and CRM connections scoped first.
  • Weeks 6–10: URLs and redirects. Kentico URL patterns mapped and redirected. Indexed product pages protected before anything retires.
  • Weeks 8–12: Running old and new side by side, then switching over. Live data against the new catalog before the switch.